Standard Lead Times
How long it takes us to build your order, and how long shipping takes once it leaves our Acworth, GA shop. Lead times are measured from order confirmation and deposit receipt, not quote date.
Flagpole Production Lead Times



Beacon Production Lead Times
Applies to all beacon models for external halyard, internal cam cleat, and internal winch flagpoles. Custom and painted finishes are confirmed at time of order.
Shipping & Typical Transit Times
Once production is complete, transit time depends on the delivery option. Typical transit times below are estimates and begin when your order ships.
Our standard shipping method. Your order moves on a freight carrier with other loads and is delivered on their route schedule.
Most Economical for Non-Local DeliveryA dedicated truck carries your order straight to your site with no other freight on board. The fastest option for deadline-driven projects.
Fastest OptionFor jobsites within our delivery zone, up to a 4-hour drive from our Acworth, GA shop, your order can be delivered the same day it ships.
Acworth, GA + 4-Hour RadiusNot sure which option fits your project? Call 800-962-0956 and we will walk you through freight options and costs for your delivery address.
Expedited Production
Need to compress the build time itself? Expedited production shortens our shop schedule. It is separate from expedited shipping above.
Flagpoles
Standard lead times apply unless otherwise stated. Requests for shipment within 10 business days may be accommodated when capacity allows.
Expedite charges do not include premium freight, special delivery, installation acceleration, or third-party charges.
Beacons
Applies to rush production on beacon orders. Rush timelines are discussed case by case.
Good to Know
- Lead times reflect current shop capacity and are subject to change during peak season (typically February through July).
- We will always flag any delays at the time of order confirmation.
- Rush requests can be discussed case by case. Call 800-962-0956 and we will see what we can do.
This page reflects lead times as of August 12, 2026 and is subject to change without notice. Contact us for the most current information.